论文部分内容阅读
白山水电站位于吉林省桦甸县境内第二松花江上游。拦河坝为三心园混凝土重力拱坝,顶宽9米,最大坝高149.5米。总装机容量为150万千瓦,将安装5台单机容量为30万千瓦的机组。年发电量20.03亿度。分两期开发,第一期工程装机三台,共90万千瓦。第一台机组今年建成发电。
Baishan Hydropower Station is located in the upper reaches of the second Songhua River in Huadian County, Jilin Province. Three Gorges dam concrete gravity arch dam, top width of 9 meters, the maximum height of 149.5 meters dam. The total installed capacity of 1.5 million kilowatts, will be installed 5 single unit capacity of 300,000 kilowatts of units. Annual generating capacity of 2.003 billion degrees. Developed in two phases, the first phase of the installation of three units, a total of 900,000 kilowatts. The first unit built to generate electricity this year.