引言由于矿物燃料的日益枯竭和予感水荒的到来,使注意力集中在国土拥有地表水资源综合利用的潜在能力上。通过改善蓄水调度和输水运行条件所取得的效益尤为人们所关注。不少系统,如田纳西流域管理局和加利福尼亚州中心流域工程局,通过对水力发电厂和供水水库的运行调度而提供大量的需水和水力发电。即使对这样系统的运行调度作微小的改进也能产
INTRODUCTION Due to the increasing depletion of fossil fuels and the arrival of water scarcity, attention has been focused on the potential capacity of land to own the comprehensive utilization of surface water resources. Of particular concern are the benefits that have been achieved by improving the conditions of water storage operations and water transfer. Many systems, such as the Tennessee Valley Authority and the Central California Basin Engineering Bureau, provide substantial water and hydroelectric power generation through operational dispatch of hydropower plants and water reservoirs. Even minor improvements to the scheduling of such systems can be made