论文部分内容阅读
一 从广西的百色出发,约行半日,就到了红水河上游的南盘江夭生桥。 自1981年以来,为了开发利用这里丰富的水利资源,武警战士就在这里修堤筑坝,建造电站。 现在,五个团队的截流大军聚集在这两平方公里的山坳里,参加天生桥电站建设会战。工地上装截机、风钻机、震德器及各种机械成天轰鸣,车来人往,热气腾腾。开挖工地是截流的主战场,今天必须保证挖出近万立方土石。担负挖、运的司机每天工作都在十六个小时以上,他们太累了。可是有什么办法呢? 在巨大的四立方挖土机驾驶室里,我们见到了三位回“娘家”来帮
A starting from Baise in Guangxi, about half an appointment, went to the upper reaches of the Red River River Nanxiaojiang Yushengqiao. Since 1981, in order to develop and utilize the abundant water resources here, Armed Police Corps has built dams and built power stations here. Now, the interception of five teams gathered in the two square kilometers of the cove, to participate in Tianshengqiao power plant construction battle. Construction site cut-off machine, wind drilling machine, vibram vibram five fingers, vibram vibration and all kinds of machinery all day roar, coming and going, steaming. Excavation site is the main battlefield closure, today must ensure that nearly 10,000 cubic meters of earth and rock excavated. The drivers who are responsible for digging and transporting carry more than 16 hours a day and they are too tired. But what is the solution? In the huge four-cube excavator cab, we saw three back to the “home” to help