在国外公路工程施工中,设备配置贯穿于项目施工的每一个阶段,施工前期的设备来源,施工进行中的设备补充等等, 这些都关系到正常的施工进度。项目监理组会在每一次工地会上对到场的设备进行一次整理并提出下一个时段的设备要求, 因为设备的合理配置及是否按时到场会直接影响施工进度,在国外施工中设备来源大体有以下几种。选购设备的三种方式从所在国其他项目调拨包括从就近国家调拨,这需要根据所在国的实际情况来定,大部分的情况下由于运输成本的关系基本考虑从本国的其他
In the overseas highway construction, the equipment configuration runs through every stage of the project construction, the equipment sources during the pre-construction phase, the equipment replenishment during construction and so on, which are all related to the normal construction progress. The project supervision team will arrange the equipment at each construction site and propose the equipment requirements for the next period because the reasonable configuration of the equipment and the timely arrival of the equipment will directly affect the construction progress. The sources of equipment in overseas construction generally include the following Several. The three ways to purchase equipment from other countries in the country include the allocation from the neighboring countries, which needs to be based on the actual situation in the host country. In most cases, due to the transportation cost,