外滩防汛墙自1993年竣工以来,曾多次出现渗漏水情况,其中在1999年3月和5月相继出现严重裂缝及涌水险情,受到了市领导和各方的关注。调查渗漏水情况分析其原因,对进一步研究维修方案至关重要。一、工程结构概况外滩防汛墙位于黄浦江左岸(浦西),自苏州河外白渡桥堍东侧起至新开河路,全长1786m。现有工程于1993年12月25日竣工,工程由外滩交通综合改造工程指挥部组织实施,建设单位为上海市市政工程管理局,
Since the completion of the Bund flood wall in 1993, there have been many cases of seepage water. In March and May 1999, serious serious cracks and water infiltration occurred, which attracted the attention of municipal leaders and all parties. Investigate the reasons for the leakage of water analysis of the situation, the further study of maintenance programs is essential. I. Structure of the Project The Bund flood control wall is located on the left bank of the Huangpu River (Puxi), starting from the east side of Baidu Bridge in the west of Suzhou Creek to Xinkaihe Road, with a total length of 1786m. The existing project was completed on December 25, 1993. The project was organized and implemented by the headquarters of the comprehensive reconstruction project of the Bund traffic. The construction unit was Shanghai Municipal Engineering Administration Bureau,