浅议水电工程勘测设计阶段投资控制

来源 :水利水电工程造价 | 被引量 : 0次 | 上传用户:zz_mars
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
水电工程建筑物庞大、复杂、不可预见因素多、施工周期长、投资难以控制,作为控制投资关键阶段——勘测设计阶段,要从提高勘测工作的精度和深度、强化设计人员的经济意识、提高造价人员的综合素质入手,变被动控制投资为主动控制投资。 As a key phase of investment control, the construction period of hydropower projects is huge, complex and unforeseeable, the construction period is long and the investment is difficult to control. In the stage of survey and design, the precision and depth of surveying work should be enhanced to enhance the economic awareness of designers and increase The overall quality of personnel to start, change passive control of investment as the initiative to control investment.
其他文献