智能变电站二次设备工厂化、一体化及自动化调试

来源 :电气应用 | 被引量 : 0次 | 上传用户:yanghong098
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
目前,智能变电站二次设备种类多、数量多,调试内容多,而建设现场调试环境一般较差,需要多个单位的工程师联合调试,调试过程中经常出现返工的现象,导致调试效率低下。在时间紧迫任务艰巨的情况下,如果调试不充分,则会埋下安全隐患。给出了工厂化、一体化及自动化的调试技术方案,将现场调试工作向厂内转移,所有产品一体化调试,采用组态调试软件实现自动化调试。该调试技术方案已在新一代智能变电站示范工程中得到应用,达到了提高调试质量、缩短调试周期及节约人工成本的目的。 At present, the secondary substations of smart substations have many types of equipment, large quantities of contents, and many contents of debugging. However, the debugging environment of the construction site is generally poor, which requires the joint commissioning of engineers of multiple units. Rework often occurs during debugging, resulting in inefficient commissioning. In times of urgent and arduous task, if the debugging is not sufficient, it will lay a security risk. The industrialized, integrated and automated commissioning solutions are given. The on-site commissioning work is transferred to the factory. All products are integratedly commissioned and the commissioning software is automatically commissioned. The debugging technical scheme has been applied in a new generation of intelligent substation demonstration project, achieving the purpose of improving the debugging quality, shortening the debugging cycle and saving the labor cost.
其他文献
海上谢稚柳陈佩秋先生书画合集寿梓,编者请加序文。仓促急就,不能备陈所以,浅绪常言,聊贡心之所向。我在“弥散与生成”国际学术研讨会上曾言及“有意味的形式”(Significant
期刊
为了可以建立一个公平、有序的建筑市场秩序,则应当加速对当前建筑行业管理体制进行改革,科学规范和间接控制等方式有效规范建筑市场的秩序,真正展现建筑市场所有部门的职能
2016年9月,我参加我中心的“绩效考核系统”的开发,我在这个项目中担任规划、设计一职,通过绩效考核管理改善中心整体的运营管理,分类分析项目成本.绩效考核主要指以委外费用
“史提夫·米勒CEO近期主要任务是与通用汽车公司、美国联合汽车工会合作,解决德尔福公司非常严重北美业务劳动力成本过高的问题,以避免进入申请破产保护程序。其次解决产品
排序是计算机程序中经常进行的一种重要操作,经过排序操作最终将一组“无序”的记录序列调整为“有序”的记录序列.文章中将提到的快速排序,是大家已知的常用排序算法中最快
期刊
Android手机软件自动化测试的质量及水平与手机软件质量有直接的关系,测试工作也具备非常严重的复杂性,因此应该有效强化测试质量及效率,进而使得测试成本得到有效降低.本文
本文主要研究了图像处理系统下位机的软硬件设计.本系统为高速电路,为了保证系统能正常高效稳定地运行,本文也研究了信号完整性的相关知识,并使用了软件对高速器件存储器的关