论文部分内容阅读
本文基于对中国大石河尾矿坝所完成的现场勘察,给出了三种原位测试数据(SPT,CPR和SWV)的分析结果及其相关性研究成果。
Based on the site survey conducted at China’s Dashihe tailing dam, the results of three kinds of in-situ test data (SPT, CPR and SWV) and the related research results are given.