论文部分内容阅读
溢流坝为枢纽的主要泄水建筑物,它的设计关系到水库泄洪的关键,文章就溢流坝设计计算进行了分析。
The design of overflow spillway is the key drainage structure of the hub. Its design is crucial to flood discharge of reservoirs. The article analyzes the design of spillway dam.