论文部分内容阅读
本文基于倾斜仪特点,融合传感器技术及计算机网络技术研发倾斜仪监测系统,对超高层建筑塔体周日摆动进行研究,重点解决超高层建筑施工控制网竖向传递倾斜偏差改正这一关键性技术难题。通过与CCD方法对比研究,结果表明:倾斜仪方法可准确获取超高层建筑的周日摆动规律,并且不需要依靠激光传输路径(如预留孔、电梯井)进行安装,安装简便,对类似工程具有借鉴意义。
Based on the features of inclinometer, fusion sensor technology and computer network technology, a tiltmeter monitoring system is developed to study the day-to-day swinging of the tower of super high-rise buildings and to focus on the key technology of vertical transmission tilt deviation correction in the construction control network of super high-rise buildings problem. Compared with CCD, the results show that the inclinometer method can accurately acquire the law of the daytime wobbling of super high-rise buildings, and does not need to rely on the laser transmission path (such as reserved hole, elevator shaft) for installation, easy installation, Have reference.