洛基山抽水蓄能工程定于1995年5月全部投入佐治亚州输电系统(ITS)商业运行。本文叙述主要电气设备的特性。特别强调了机组作为水泵运行时为什么选用静态变频起动,以及电站在完全手动和自动运行时采用分布式控制系统(DCS)的原因。
The Rocky Mountain Pumped Storage Project is scheduled to be fully operational in Georgia’s power transmission system (ITS) in May 1995. This article describes the characteristics of the main electrical equipment. Particular emphasis was given to why the unit was operated as a static pump with static frequency conversion and why the DCS was used when the plant was fully manual and automatic.