论文部分内容阅读
1 基础冲坑概况 黄龙滩水利枢纽位于鄂西北山区堵河下游,是一个以发电为主,兼有工农业用水等综合效益的水利枢纽,由拦河坝、左岸岸边引水式地面厂房、右岸工业供水管及通航建筑物组成,正常蓄水位247.00m,最大坝高107m,装机15万kW. 1980年6月黄龙滩
1 Basic Chongkeng Overview Huanglongtan Water Control Project is located in the lower reaches of the Du River in the mountainous area of northwestern Hubei Province. It is a water conservancy hub with the comprehensive benefits of power generation and industrial and agricultural water supply. It consists of barrage, diversion ground plant on the left bank and right bank industrial water supply Pipes and navigation structures, the normal water level 247.00m, the maximum dam height 107m, installed capacity 150,000 kW. June 1980 Huanglongtan