我站1~卅、2~卅水轮发电机组在八三年七月全部遭洪水淹没73小时,经大修处理(分别更换了6个和1个线圈)、予试合格,于八三年十月投入运行。2~#机运行2437小时后;八四年二月二十九日检查性试验中,9450伏直流耐压合格后进行交流耐压,当电压升至7000V时C相击穿1个线圈(在第18槽)。1~#机运行2264小时后,八四年三月十三日检查性试验中,直流耐压时分别升至9450V、6300V,A、C两相各击穿1个线圈(在第68槽和第130槽)。时值汛期来临,县电力紧 I stand 1 ~ 卅, 2 ~ 卅 hydroelectric generating units in July 1983 all flooded 73 hours, overhaul treatment (were replaced by 6 and 1 coil), to the test pass, in ten eight years Month put into operation. 2 ~ # machine running 2437 hours; February 29, 1984 inspection test, 9450 V DC withstand voltage AC withstand voltage, when the voltage rose to 7000V C phase breakdown of a coil (at 18th slot). 1 ~ # machine running 2264 hours, March 13, 1984 inspection test, the DC voltage withstand rose to 9450V, 6300V, A, C breakdown of each of the two coils (in the 68th slot and 130th slot). When the flood season is coming, county electricity tight
其他文献
中国与加拿大同属环太平洋国家,一个是最大的发展中国家,一个是世界工业七强之一,中加两国开展贸易40多年来,双边贸易额不断上升。据我国海关统计,1994年中加双边贸易总额为
︺︺汀,必冬)》允尸万之花‘:卜每万补万补每补补妙。尸)今7每妙 (中国机电产品进出口商会提供数字)之,2二抢阿二,二花尸二,)夕二花尸之,竺花尸今2之二卜之今。少之、少仑?之,‘
中国水力发电工程学会水力机械专业委员会和中国电机工程学会水电设备专业委员会,于1985年3月26日至3月31日在广西南宁联合主持召开了学术讨论会。参加会议的有:两个专业委
沟壑打坝蓄水拦泥,容易抬高地下水位,形成坝地盐碱化。防止办法有: 一、用沙沟或无沙混凝土管排水。在盐碱化坝地内,挖2米深沟槽,用反滤料回填1米,埋设无沙混凝土管,上面用
东北地区既缺电量,又缺电力。目前,由于电量不足,使全区现有20%以上的工业设备不能充分发挥作用;由于电力不足,迫使电网中的高温高压火电机组不得不大量参与调峰。加之火电
近来,水工建设在全世界实践的发展趋势是减少厂房起重机的起重量可降低水电站厂房的造价。在这种情况下,经济效益的实现,不仅通过降低厂房本身造价而且也取决于减轻厂房上部
在水电站的可行性研究或初步设计的方案比较过程中,需要计算厂房的混凝土量。设计人员希望将混凝土量的计算方法加以简化,以减少重复劳动和节省时间。 During the feasibil
水电站内水工管理,一般限制在距坝轴线四、五百米的范围内。可是,往往在紧挨限制线外不远的河道,有着较大的节能潜力。据作者观察,富春江水电站的下游河道,就是一个明显例子
为了改变易产生水土流失的局部地形,控制水土流失,消灭杂草,改善土壤蓄水、通气条件,提高造林成活率,山区造林必须进行预整地。整地工程的标准,一般应能拦蓄20年一遇暴雨所
为了减少水力损失和更好地利用材料,瑞士爱雪维斯工厂研制了一种新型双平板蝴蝶阀。通过详尽的试验证明,这种双平板蝴蝶阀活门的性能是优越的,对于大直径活门来说此点更为突