【摘 要】
:
一、概述水电站厂房发电机层一般高达20余米,面积达数千至上万平方米。以往水电站的暖通设计,对中小型工程可采用自然通风或机械干通风,而对要求高的工程则采用全室空调,即
论文部分内容阅读
一、概述水电站厂房发电机层一般高达20余米,面积达数千至上万平方米。以往水电站的暖通设计,对中小型工程可采用自然通风或机械干通风,而对要求高的工程则采用全室空调,即夏季向整个发电机层空间送冷风,这样不仅投资高,耗能也是相当可观的。但生
First, an overview Power station plant generator layer is generally up to 20 meters, an area of thousands to tens of thousands of square meters. In the past, HVAC design of hydropower stations could use natural ventilation or mechanical ventilation for small and medium-sized projects. However, for those projects with high requirements, all-room air conditioners were adopted, that is, cold air was sent to the entire generator space in summer so that not only high investment and energy consumption It is also quite impressive. But students
其他文献
当前,日本经济仍然疲软,日元急速升值,市场不景气,日商加强对外采购,日本市场商品流行趋势是什么呢?
At present, Japan’s economy is still weak, the rapid appreciatio
市场规模及主要进口来源 巴西约有电子元器件生产企业200家,职工人数1.5万人,1994年销售额增长30%,达到14.76亿美元。当地销售额最大的4家企业依次为CCE(1.8亿美元),CCC Comp
本报告搜集了最近正在实验室内,进行试验的大坝扬压力观测资料,及几座已建成的坝观测数年后的实测结果,经整理分析简介如下。一.调查概要 在已建成的坝中,扬压力值多数利用
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
苏联的科学家们已经建议在废弃的采矿场修建抽水蓄能电站。乌拉尔科金诺采煤坑是世界上最大的人工洼地。据研究,在这里修建抽水蓄能电站是不会有困难的。采煤坑可作为电站下
五强溪水电站位于湖南沅水中下游,为湘西水电基地的重要电源点,是沅水干流梯级开发中的第一期工程.该工程地质勘测工作前后经历了30多年,除去间断的时间,累计进行了22年的工
【按语】国际灌溉排水委员会于1988年10月1日在南斯拉夫举行第39届专门技术会议,中心议题为防洪经济方面的问题和防洪的非工程措施。会议论文集刊登了28篇论文,内容涉及防洪
一、概述自建国以来,海河流域山区共兴建大型水库[包括大(1)、大(2)型]29座,其中土石坝型水库26座,总库容约220m~3,其中防洪库容124.95亿m~3,兴利库容88.35m~3,控制流域面积
1986年8~9月,笔者访问了现代混凝土面板坝的故乡——澳大利亚塔斯玛尼亚岛。该岛已建造了9座混凝土面板坝,最高的是1986年完工的 Lower Pieman(Reece)坝,高122m,还有5座正在
在苏联以爆破法构筑土工建筑物始于三十年代。起初用定向爆破法建造用于工业工程的低堤堰,嗣后则用于建造大坝及堤防。近15~20年来,采用定向大爆破筑成的大型工程有:72米高的