一、对电化后武汉枢纽能力不足的分析郑武铁路电化工程完成后,武汉枢纽能力虽然有所提高,但与“八五”期间的运量要求相比,缺口仍然很大。这一方面是地理环境的确太复杂,一方面是在发展铁路的导向上有偏差,正是主客观原因相互交织,其问题才显得尤为严重。对此,我们进行了深入的调查研究,并就其中的一些疑难问题进行了认真分析,从分析的情况看,武汉枢纽能力之所以适应不了“八五”运量增长的需要,主要原因如下。
I. Analysis of the Capabilities of Wuhan Hub after Electrification Zhengwu Although the capacity of Wuhan hub has been improved after the completion of the electrification project of Zhengwu Railway, the gap is still large compared with the traffic requirement during the “Eighth Five-Year Plan” period. On the one hand, the geographical environment is indeed too complicated. On the one hand, there is a deviation in guiding the development of the railway. The reason for this is that the subjective and objective reasons are intertwined and the problem is particularly serious. In this regard, we conducted in-depth investigations and studies and conducted careful analysis on some of these difficult problems. From the analysis of the situation, the reason why Wuhan’s hub capacity can not meet the needs of the growth in the “Eighth Five-Year Plan” period is mainly due to the following reasons.