1 引言“Monte Olimpino 2号”隧道位于意大利北部,是意大利——瑞士铁路现代化项目的一部分。修建此洞的主要目的是缩短原线路、节省运输时间。隧洞竣工后,将推动哥大(Gotthard)铁路线上国际货运业的发展。按照欧洲铁道标准,该段隧洞断面面积为105 m~2,用素混凝土衬砌。设计横断面见图1。隧洞轴线大致为南北向,从南到北沿线穿越的岩层为:冲积层约350 m,砂岩1500 m,冲积层和冰川沉积层750 m,坚硬砾岩4500 m。在隧洞穿过冲积层租冰川沉积层的750m 段,使用旋喷技术(即高压喷射灌浆)作为临时支护。本文首先阐述冲积层和冰川沉
1 Introduction The “Monte Olimpino 2” tunnel is located in the northern part of Italy and is part of the Italian-Swiss railway modernization project. The main purpose of building this hole is to shorten the original line, save transportation time. Completion of the tunnel will facilitate the development of the international freight industry on the Gotthard railway line. According to the European railway standards, the tunnel cross-section area of 105 m ~ 2, prime concrete lining. Design cross-section shown in Figure 1. The axis of the tunnel is generally north-south direction. The strata crossing from south to north are about 350 m in alluvium, 1500 m in sandstone, 750 m in alluvium and glacial sediments, and 4500 m of hard conglomerates. In the tunnel through the alluvial glaciers rented layer 750m section, the use of spin-jet technology (ie high-pressure jet grouting) as a temporary support. This article first describes alluvial layers and glacial deposits