论文部分内容阅读
委内瑞拉目前在建的托科马工程是卡罗尼河下游第4座也是最后一座大型水电工程,工程总装机容量2160MW。介绍了工程的设计和规划情况,包括选址、主要建筑物的设计以及该工程在委内瑞拉国家电网中的作用。
The Tocoma project currently under construction in Venezuela is the fourth and last major hydropower project on the lower reaches of the Caroni River with a total installed capacity of 2160MW. The design and planning of the project were introduced, including site selection, design of the main building and the role of the project in the national grid of Venezuela.