内蒙古京隆发电有限责任公司位于内蒙古乌兰察布丰镇市,于2003年10月注册成立,由北京京能国际能源股份有限公司、北京能源投资(集团)有限公司和内蒙古蒙电华能热电股份有限公司共同投资。公司按照4×600 MW机组容量设计,其中,一期2×600 MW直接空冷燃煤发电机组工程于2008年通过168 h试运,在蒙西电网投入商业运行;2012年4月切改至京津唐电网,成为京津唐电网的重要电源支撑点。一期工程利用城市中水回收和空冷技术,比同类湿冷机组节水75%以上。目前,2台机组全部进行了脱硫增容改造、
Inner Mongolia Jinglong Power Generation Co., Ltd. is located in Wulanchabu Fengzhen, Inner Mongolia. It was incorporated in October 2003 and is comprised of Beijing Jingneng International Energy Co., Ltd., Beijing Energy Investment (Group) Co., Ltd. and Inner Mongolia Mengdian Huaneng Power Co., Ltd. Limited co-investment. The company designed according to 4 × 600 MW unit capacity, of which, a 2 × 600 MW direct air-cooled coal-fired generating units project in 2008 through 168 h trial operation, put into commercial operation in Mengxi power grid; in April 2012 to Beijing Tianjin Tang Power Grid, Beijing and Tianjin Tang Power Grid has become an important power point. A project using urban water recovery and air-cooled technology, than similar wet and cold water-saving unit more than 75%. At present, all 2 units have been desulfurized and compatibilized,