【摘 要】
:
(一) 佈置概述流溪河水电站为一單拱坝?又肺挥诘刭|优良花岗岩V形峡谷中。坝高78公尺,坝軸長250公尺,坝基高程162公尺,坝顶240公尺,正常高水位235公尺,洩洪采用拱坝顶溢流及
论文部分内容阅读
(一) 佈置概述流溪河水电站为一單拱坝?又肺挥诘刭|优良花岗岩V形峡谷中。坝高78公尺,坝軸長250公尺,坝基高程162公尺,坝顶240公尺,正常高水位235公尺,洩洪采用拱坝顶溢流及隧洞联合方案,而以隧洞为主。拱坝堰頂高程235公尺,采用自由溢流不设闸门。本文介紹洩洪隧洞的设計,至于拱坝顶溢流,以后另行介紹。
(A) Layout Overview Liuxihe Hydropower Station is a single arch dam and lungs 诘 诘 刭 | fine granite V-shaped canyon. The height of the dam is 78 meters, the length of the dam shaft is 250 meters, the elevation of the dam foundation is 162 meters, the crest is 240 meters and the normal high water level is 235 meters. The flood control adopts arch dam roof overflow and the joint program of the tunnel. Arch dam weir top elevation of 235 meters, with no free gate overflow. This article describes the design of flood discharge tunnel, as for the arch dam overflow, introduced later.
其他文献
A novel red-emitting phosphor, CaYAl3O7 : Eu 3+ , Sm3+ , is synthesized by a combustion method at a low temperature (850℃), and the single phase of CaYAl3O7 is
我有一台航空50-Q型摩托车,使用中混合气的浓度始终无法达到满意的效果。该车主喷油针共有5道卡槽。当处在中间卡槽时,行驶中出现贫油症状;若向下调一格时,又出现富油现象。
今年6月间,一次偶然的机会,我在摩托车商店门前见到了JS60,它那紧凑的“骨架”、匀称的“身段”、素雅的外表、简捷明快的发动机诱使我驻足观望,心想,这么小巧精致的摩托车
The title platinaborane, [(P (2) Ph 3)Pt (1) ( μ 2 B (11) (B (9) OC~(CH 3) 3 B 10 ~H 10 ))Pt (7) (P (1) Ph 3)] 2
以滇池流域5种主要人工林(柏木林、桉树林、银荆林、华山松林和云南松林)为研究对象,通过样方调查,分析群落结构特征,并构建了由植被、枯落物、土壤、地形4个因子组成的水土
With insulin methanol water, and the ion pairing agent, hydrochloric acid and trifluroacetic acid (TFA), the character of the first plateau (FP) on the elutio
With the unceasing expansion of mobile communication network and the explosive growth of mobile Internet, more and more attention has been paid to the shortage
1 事故经过1999年4月7日9时10分,独山子石化总厂乙烯厂空分车间正在运行的国产6M5.5—34.9/30—1型活塞式1#氧压机发出很大的异响,岗位操作工立即将听到的情况用电话向主控室报告。当时在氧压机代岗的副
連拱坝在横向地震时的結构作用是十分复杂的,看來此較現实的解决途径是把惯性力当作靜力計算,而引用地震譜曲线并調整慣性力的分佈以考虑地震特性及結構的动力性能。因此,今
据1999年有关世界竞争力报告,我国从事研究与开发(RD)科技活动的人数,世界排名第4位,有明显优势。但“获得合格工程师难易程度”世界排名第47位(倒数第一),“IT技术人才的可获得程度”排名第46位,“