江苏省江都水利枢纽工程地处扬州以东14公里的江都市区,位于京杭大运河、新通扬运河和淮河入江尾间芒稻河的交汇处。该工程由4座大型电力抽水站、5座大型水闸、7座中型水闸、3座船闸、2个涵洞、2条鱼道以及输变电工程、引排河道组成,是一个具有灌溉、排涝、泄洪、通航、发电、过鱼等综合功能的大型水利枢纽工程。其中4座抽水站共装有大型立式轴流泵机组33台套,装机容量53000KW,最大抽水能力为508M/s,是目前我国乃至远东地区规模最大的电力排灌工程。该工程建成以来,已累计抽引江水960多亿立方米,排涝265亿立方米,排洪6350
The Jiangdu Water Control Project in Jiangsu Province is located in the urban area of Jiangdu, 14 kilometers east of Yangzhou. It is located at the confluence of the Grand Canal, Xin Tong Yang Canal and the Man Rice River at the end of the Huai River. The project consists of four large-scale power pumping stations, five large sluices, seven medium-sized sluices, three locks, two culverts, two fish tracks and power transmission projects. The project is an irrigation, drainage, Flood discharge, navigation, power generation, over the fish and other integrated functions of large-scale water control project. Among them, four pumping stations are equipped with 33 sets of large-scale vertical axial-flow pump units with an installed capacity of 53000KW and a maximum pumping capacity of 508M / s, making it the largest electricity drainage and irrigation project in China and even the Far East. Since the completion of the project, a total of more than 96 billion cubic meters of water have been drawn from the river, discharging 26.5 billion cubic meters of water and discharging 6350