恰甫其海水利枢纽工程初步设计中水库淹没处理补偿概算投资31328万元。水库淹没耕地38135.5亩,草场18488.5亩,林地12270.1亩,拆迁各类房屋196189m2,计划搬迁人口11466人。从2002年开始移民安置区建设,2003年下半年移民正式开始搬迁,2004年底基本搬迁完毕,2005年6月10日库区清理
In the preliminary design of Qiafuqihai Water Control Project, the estimated investment of reservoir inundation compensation was 313.28 million yuan. The reservoir flooded 38135.5 mu of cultivated land, 18488.5 mu of grassland and 12270.1 mu of woodland, and all kinds of houses were demolished 196189m2, with a planned relocation population of 11,466. Since 2002, the construction of resettlement areas has started. In the second half of 2003, the relocatees officially started to relocate. At the end of 2004, the relocation was basically completed. On June 10, 2005, the reservoir area was cleared