水利水电工程施工索赔在合同实施过程中是必然存在的。引起施工索赔的原因主要有两类,一是因发包人或监理人违约而引起的损失,承包人有权提出费用或延长工期的索赔;二是合同变更索赔,承包人有资格为合同变更或追加工作取得额外费用补偿或延长工期。在提出索赔前,必须有足够的证据证明自己的索赔要求合理,编写索赔报告要突出重点、证据充分、合理引用法规及合同条文、提供准确的数据资料。
Water conservancy and hydropower project construction claims in the process of the contract is inevitable. There are two main reasons for the construction claim. The first is the damage caused by the breach of contract by the contractor or supervisor. The contractor has the right to claim the expenses or extend the construction period. The second is the claim for change of contract. The contractor is eligible to change the contract or Additional work to obtain additional costs to compensate or extend the duration. Before filing a claim, there must be sufficient evidence to justify its claim, the report should be focused, the evidence sufficiently substantiated, the laws and regulations and contract provisions should be used rationally to provide accurate data.