论文部分内容阅读
为了高速发展我国炼铜工业,赶超世界先进水平,我国自行设计、制造、安装的100(吨/日)闪速炼熔工业试验装置(包括闪速炉、精矿干燥系统、废热锅炉、收尘及制酸系统),自一九七六年六月在常州冶炼厂建成以来,先后进行过三次试验,结果表明:采用闪速熔炼处理德兴铜精矿是可行和合理的,主要技术经济指标达到或接近原设计的要求,显示出闪速熔炼炼铜工艺的优越性。冶金部科技办公室、江苏省冶金局于一九七八
In order to rapidly develop China’s copper industry, catch up with the world’s advanced level, China’s own design, manufacture, installation of 100 (t / day) flash refining industrial test equipment (including flash furnace, concentrate drying system, waste heat boiler, Dust and acid-generating system). Since its establishment in Changzhou Smelter in June 1976, it has carried out three tests successively. The results show that it is feasible and reasonable to process the Dexing copper concentrate by flash smelting. The main technical and economical The indicator meets or approaches the original design requirements and shows the superiority of flash melting process. Ministry of Metallurgical Science and Technology Office, Jiangsu Provincial Metallurgical Bureau in 1978