论文部分内容阅读
文章介绍了钻孔灌注桩施工准备阶段、施工过程中各个环节的控制要求,并对混凝土浇注控制要点以及钻孔灌注桩工程验收内容进行了介绍。
This paper introduces the control requirements of each step of the construction process of the bored pile construction, the key points of the concrete pouring control and the acceptance of the bored pile engineering.