一、前言在枢纽的布置中,一般应贯彻下面一些原则:(1)充分适应和利用坝址的自然条件;(2)尽可能满足国民经济各部门临时和永久的要求;(3)各个建筑物在运转中不致发生相互干扰;(4)工程量小,造价低;(5)施工简单方便,施工期限短。在目前施工机械缺乏的情况下,还应多考虑土洋结合的办法。武都水利枢纽在嘉陵江支流涪江的上游,是一个综合利用的枢纽,电站装机14.5万瓦,建成后可以满足绵阳等新兴工业基地近期用电要求,灌溉、防洪和航运的效益也都比较显著。
I. INTRODUCTION In the arrangement of hubs, the following principles should be followed: (1) The natural conditions of dam sites should be fully adapted and utilized; (2) The temporary and permanent requirements of all sectors of the national economy should be satisfied as much as possible; (3) In the operation will not interfere with each other; (4) a small amount of work, low cost; (5) the construction is simple and convenient, the construction period is short. In the current lack of construction machinery, should also consider ways to combine the soil and the earth. Upstream of the Fujiang River, a tributary of the Jialing River, Wudu Water Control Project is a comprehensive utilization hub. The installed capacity of power plants is 145,000W, which will meet the recent electricity requirements of emerging industrial bases such as Mianyang. The benefits of irrigation, flood control and shipping are also significant .