论文部分内容阅读
1986年12月笔者趁参加日本第七届地震工程会议之机,参观访问了两座具有代表性的建设中的核电站:其一为浜冈核电站,位于强震活动区,按震级8.4震中区的地震动强度进行抗震设计;其二为柏崎刈羽核电站,计划装机容量800万瓩,建成后将成为世界上最大的核电站,其2号与5号机组均110万瓩级,正在进行建造,笔者得以深入现场进行参观了解。同时还参观访问了进行核电站设备验证试验的大
December 1986 While taking part in the Seventh Earthquake Engineering Conference in Japan, the author visited two representative nuclear power plants under construction: one is the Hamaoka Nuclear Power Station, located in a strong earthquake activity zone, Earthquake intensity of the earthquake-resistant design; the second Kashiwazaki Kariya nuclear power plant, the planned capacity of 8000000 瓩, after the completion of the building will become the world’s largest nuclear power station, its No. 2 and No. 5 units are 1.1 million 瓩 class, is under construction, I have to In-depth visit to understand. At the same time also visited and visited the nuclear power plant equipment verification test of the big