论文部分内容阅读
“老孙,轨道暗斜井内的运输轨道目前铺设的怎么样了?”3月12日早班,山东丰源集团公司张集煤矿生产副总兼掘进工区主管区长王健跟班下井来到轨道暗斜井施工巷道现场检查轨道铺设质量,他向现场带班施工的班长孙勇问道。“王副总,目前进度很顺利,我们这个班刚刚铺设了一段50米的运物料轨道,靠巷道两帮,我们也用液压单体支柱打好了支护,既保证了进度,也保证了现场安全。”王副总似乎没有搭理身边的孙班长,他径直来到面前刚铺设好的轨道旁,随手拿起一根一米多长的铁钎子,往轨道枕木两侧的石子儿上使
“Sun, the track orbit within the transport shaft is currently laying like how?” “March 12 morning shift, Shandong Fengyuan Group Zhangji coal mine production and vice president of district heading area chief Wang Jian went down to work To track dark inclined shaft construction roadway inspection track laying quality, he asked the squad leader with the construction of the scene Sun Yong. ”Wang, vice president, the current progress is very smooth, we have just laid a class of 50 meters of material transport track, by the roadway two gang, we also lay the support of hydraulic single prop, both to ensure the progress, but also to ensure The scene security. “” Wang did not seem to take care of the side of the vice squad leader, he went straight to the laying of a good track in front of readily pick up a one meter long iron brazing, orbital sleepers on both sides of the stones Children make