生产方面生产方面的开支估计为数最大,即:108,062百万盾,等于全部估计240,000百万盾的45.02%国家计划委员会在这方面的蓝图已被很好的接受了,其内容如下:名称项目估计费用食品生产 8项工程 25,120百万盾衣着生产 7项工程 28,945百万盾工业生产 81项工程 52,022百万盾药品生产 6项工程 2,175百万盾分类大概如下:食品生产:在全印尼及爪哇增设稻谷中心站.稻谷中心站是由群众增产运动领导的,它是积极增加
Production production is estimated to be the largest, ie 108,062 million shields equal to 45.02% of the total estimate of 240,000 million shields The blueprint for the State Planning Commission has been well accepted in this regard as follows: Name Project Estimate Costs Food Production 8 Projects 25,120 Million Shields Production 7 Projects 28,945 Million Shields Industrial Production 81 Projects 52,022 Million Shields Drug Production 6 Projects 2,175 Million Shields The breakdown is as follows: Food Production: Add in All Indonesia and Java Rice Center Station The Rice Center Station is led by mass production campaigns, which is a positive increase