论文部分内容阅读
1979年,我公司在抚顺石油一厂污水处理装置的8座曝气池工程上使用了液压水平圆周滑模施工方法,改变了以往曝气池池壁现场支模浇制的工艺,将竖向的液压滑模的施工方法用于圆周向的水平滑模,节省了木材,提高了劳动效率。曝气池是污水处理的主要装置。池壁外径16.9米,壁高3.6米,壁厚0.2米,上部有0.9×0.6米的溢流水槽。为配合池壁滑模施工,将溢流水槽改为预制,在池壁滑模施工
In 1979, our company used the hydraulic horizontal circular sliding mode construction method on the 8 aeration tanks of the Fushun Oil Plant Wastewater Treatment Plant, which changed the casting process of the past molds on the tank wall of the past aeration tank. The construction method of the hydraulic sliding mode is used for the circumferential horizontal sliding mode, saving the wood and improving the labor efficiency. The aeration tank is the main device for sewage treatment. The outer diameter of the pool wall is 16.9 meters, the wall height is 3.6 meters, and the wall thickness is 0.2 meters. There is an overflow tank of 0.9 x 0.6 meters in the upper part. In order to cooperate with the construction of the sliding wall of the pool wall, the overflow tank is changed into prefabricated and the sliding wall construction is performed on the pool wall.