随着国营大中型企业经营机制的转换,水电七局正以勃勃生机长人社会,承建了一批中小型水电施工项目,在投标招标的竞争中取得了良好的信誉。其中主要承建的工程项目有五强溪船闸工程、太平驿首部闸坝工程、东西关电站、槽渔滩电站等。五强溪水电站位于湖南省沅陵县境内沅水干流上,电站装机容量120万kW,七局中标的三级船闸,
With the transformation of the operating mechanism of state-owned large and medium-sized enterprises, the Seventh Hydropower Bureau is building a group of small and medium-sized hydropower construction projects with vigorous social support and has achieved a good reputation in the bidding competition. Among them, the major construction projects include Wuqiangxi Ship Lock Project, Taipingyi Head Gate Dam Project, East-West Power Station and Tanyuitan Power Station. Wuqiangxi Hydropower Station is located in Yuanling County, Hunan Province, the territory of the Yuanshui main stream, power station installed capacity of 1200000 kW, seven innings won the three lock,