【摘 要】
:
黄河刘家峽水电站是我国技术人員自己进行設計的第一个特大型綜合性水力樞紐。設計容量为100万瓩,年发电量为三门峽水电站的1.1倍,为官厅水电站的75倍。它將要和这个地区正
论文部分内容阅读
黄河刘家峽水电站是我国技术人員自己进行設計的第一个特大型綜合性水力樞紐。設計容量为100万瓩,年发电量为三门峽水电站的1.1倍,为官厅水电站的75倍。它將要和这个地区正在建設的火电站和將来要逐步建設的黄河上游巨型水电站如:龙羊峽(100万瓩)、黑山峽(150万瓩)、鹽鍋峽(50万瓩)等組成一个我国西北地区巨大的电力系統,保証西北地区
The Yellow River Liujiaxia Hydropower Station is the first large-scale comprehensive hydropower hub designed by our country’s technicians. Design capacity of 1 million 瓩, the annual generating capacity of 1.1 times the Sanmenxia Hydropower Station, 75 times the Guanting Hydropower Station. It will be composed of thermal power stations under construction in the area and giant hydroelectric stations upstream of the Yellow River to be built in the future such as Longyangxia (1 million), Heishanxia (1.5 million) and Yanghuoxia (500,000) A huge power system in northwest China to ensure that the northwest
其他文献
A supergene gold deposit is located at Shewushan, south Hubei, Central China. The Au mass fraction of the supergene deposits ranges from 1.0.10-6 to 19.5 10-6
一对新婚一个月的夫妇在印度地震废墟中被困两天后终于获救,是爱情的力量使他们战胜了死神。27岁的丈夫奇瑞格说,1月26日早晨大地震发生时,他和妻子正在4层楼的家中,他使劲
溢流坝的流量系数难于从模型准确地评定,因为该系数随着模型尺寸的减小而减小。为了确定模型缩尺对计算结果的影响。在印度灌溉研究院(IRI)用不同大小的溢流坝模型进行了试
设计水库时必须知道: (一)水库建成後,各个时期地下水的壅水高程和浸没沿岸地区各低窪地段的可能性; (二)水库建成後各个时期内浸湿两岸的渗失量以及水库渗漏时期的久暂; 为
土工测试仪器包括勘探取样设备、物理力学性试验仪器(包括现场试验仪器及室内试验仪器)及现场观测仪器等几个方面。勘探取样设备是用以探明各种不同土质分布的深度及范围,并
用设计暴雨进行设计洪水的计算是我省设计洪水计算的重要途径,对于广大中小流域,因其流域面积较小,流域汇流历时较短,因而往往需要利用短历时设计暴雨进行中小流域的设计洪
2013年1月3日以来,浙江中北部地区出现大范围持续降雪天气,局部出现中到大雪。杭州、湖州、衢州等地积雪严重,部分山区积雪已达20公分以上,对我省林业生产造成了严重影响。
Characteristics of fluoride emission from five clay minerals (montmorillonite, kaolinite, vermiculite, geothite, and allophane) as affected by temperature, heat
友谊外供企业适应变化拓展经营刍议金利娅(浙江省华侨友谊公司)建立于五十年代的友谊外供企业(包括友谊、华侨、外轮供应公司、商店等),是我国国有商业中的一个特殊企业群体。目前
现代水轮机正在向大容量、大尺寸的方向发展,使用参数迅速提高。本文通过统计,分析,列举了一些国家的水轮机水头、模型和电站汽蚀系数与比转速的关系,并通过转轮汽蚀限和强度