在冻结法凿井中,准确掌握冻结壁的形成状况、正确确定井筒开挖时间和选择合理的施工方案,可加快建井速度、保证施工质量、提高经济效益。为此必须对冻结过程中的冻结壁形成实况进行有效而可靠的检测。为此目的,北京煤炭科学研究院建井所和安徽省煤研所、淮南煤指科研所、东北工学院、安徽省煤炭工业公司特凿一处共同研制了DSC-1型冻结壁声波检测仪。该仪器已通过了技术鉴定,并确定了小批量生产。
In the freezing method of shaft sinking, accurate control of the formation of the frozen wall, the right to determine the wellbore excavation time and select a reasonable construction program can speed up the construction of wells to ensure the quality of construction and improve economic efficiency. To this end, it is necessary to conduct an effective and reliable detection of the frozen wall formation in the freezing process. To this end, Beijing Institute of Coal Mine Construction Institute and Coal Research Institute of Anhui Province, Huainan Coal Research Institute, Northeast Institute of Technology, Anhui Coal Industry Co., Ltd. specializes in a co-developed a DSC-1-type frozen wall sound wave detector . The instrument has passed the technical appraisal, and identified a small batch production.