论文部分内容阅读
结合实际工程详细设计了水泥搅拌桩复合地基沉降试验方法 ,跟踪观测了水泥搅拌桩复合地基加固体沉降和下卧层沉降 ,以探索两者随荷载、时间的变化规律。
Combined with the actual project, the settlement test method of cement-mixed piles composite foundation was designed in detail. The settlement of cement-soil mixing pile composite foundation and the settlement of subsoil were tracked to observe the variation of the two with the load and time.