近年来,双T板建筑在陆续试点。过去大都选用取材较难的高强钢材做双T板的预应力主筋,而冷拔低碳钢绞线虽已见用于其他中、小构件,但未见用于双T板建筑。1978年以来,我市在实施双T板建筑试点工程中,为立足于容易取材的普通钢材,以有利于推广应用,对采用冷拔低碳钢绞线做双T板的预应力主筋进行了试验,并用于试点工程。从构件简易的工厂化生产到运输、吊装、装修等工序已初步形成每年可完成一万m~2左右的建造能力。79年
In recent years, double-T plate construction has been gradually piloted. In the past, most of the high-strength steels with difficult materials were selected as the prestressed main bars of the double T plate. Although cold drawn low-carbon steel strands have been used for other medium and small components, they have not been used for double T plate construction. Since 1978, in the implementation of the double-T plate construction pilot project in our city, based on the easy access to ordinary steel, in order to facilitate the popularization and application, the use of cold-drawn low-carbon steel strands to do double-T plate prestressed main bar carried out Tested and used for pilot projects. From simple industrial production of components to transportation, hoisting, decoration and other processes, a construction capacity of approximately 10,000 m2 per year has been initially established. 79 years