论文部分内容阅读
1 引言 巴基斯坦恰希玛300MW核电厂是我国承担的第一个大型对外核电建设项目(以下简称PC项目)。其设计总包任务由我国大陆自行设计研制第一座核电厂——秦山300MW核电厂的总体设计院——上海核工程研究设计院承担。PC项目的设计质量保证随着设计承包合同的生效和实施而展开。根据核安全法规HAF0400(91)的规定,必须采取措施,以验证质量保证大纲的执行情况及其有效性;必须根据需要,执行有计划的,有文件规定的内部及外部监查,以验证设计活动是否满足质量保证大纲的各个方面的要求,并确定大纲的有效性。PC项目的方案设计、初步设计已经完成,施
1 Introduction Pakistan Chashma 300MW nuclear power plant is China’s first commitment to large-scale nuclear power projects (hereinafter referred to as PC project). The design of the total package task by our own mainland design and development of the first nuclear power plant - Qinshan 300MW nuclear power plant overall design institute - Shanghai Nuclear Engineering Research and Design Institute commitment. Design Quality Assurance for PC Projects Expand with Effectiveness and Implementation of Design Contract. In accordance with the provisions of nuclear safety regulation HAF0400 (91), measures must be taken to verify the implementation and effectiveness of the QA program; planned and documented internal and external audits must be performed as required to validate the design Does the activity satisfy all aspects of the QA program and determine the validity of the program? PC project design, preliminary design has been completed, Shi