论文部分内容阅读
工程造价的最终确定,是工程费用清算和工程尾款拨付的主要依据。工程最终造价的确定,一般可通过以下两个途径: 一、投资方(业主)有内审能力(权力)的,可通过内部审定的方式,对该绿化工程最终造价予以确认。二、投资方(业主)没有内审能力(权力)的,可委托社会上工程造价咨询机构,对该绿化工程最终造价予以确定。工程最终造价的审查、确认工作是一项严肃的政策性较强的经济工作,审查人员必须具备较高的政治素养和业务能力,本着公平、合法、合理的原则,才能实事求是地搞好这项工作。对绿化种植工程造价审定而言,审价人员必须依据工程竣工图、工程变更签定单、质量验收等资料,并经
The final determination of project cost is the main basis for the settlement of project costs and the payment of the project balance. The final cost of the project can be determined by the following two ways: 1. The investor (owner) has the internal audit capability (power), and the final cost of the afforestation project can be confirmed through internal validation. Second, investors (owners) do not have the ability to audit (power), commissioned by the community project cost advisory body to determine the final cost of the afforestation project. The examination of the final construction cost of the project confirms that the work is a serious economic work with strong policy and policy. The inspectors must have high political literacy and professional competence. Only in accordance with the principles of fairness, lawfulness and reasonableness, can this matter be properly managed Work For afforestation project cost validation, the auditors must be based on the completion of the project plans, engineering change the bill of lading, quality inspection and other information, and by