论文部分内容阅读
                            
                            
                                建技[2011]144号各铁路局,投资、集装箱公司,各铁路公司(筹备组):为加强铁路工程建设标准动态管理,进一步完善铁路工程建设技术标准体系,经审核,自即日起废止《关于加强营业线施工中光电缆线路安全工作的通知》(建技[2003]1号)、《关于发布铁路线路等专业43项标准图的通知》(建技[2003]18号)、《关于时速200 km双层集装箱隧道限界的复函》(建技[2003]69号)、《关于部分标准图降为院通用图或停止使用的通知》(建技[2003]89号)、《关于发布铁路线路等专业
Construction Technology [2011] No. 144 Railway Administration, Investment, Container Lines, Railway Companies (Preparatory Section): In order to strengthen the dynamic management of railway construction standards and further improve the technical standard system of railway construction, upon examination and approval, the “ Notice on Strengthening the Safety of Optical Cable Lines in Sales Line Construction ”(Jian Technology [2003] No. 1), Notice on Issuing 43 Standard Schemes of Railway Lines and Other Professions (Jian Technology [2003] No. 18),“ Reply to the Boundary of Tunnels with a Speed of 200 km per Double Decker Container ”(Jian Ji [2003] No. 69),“ Notice Concerning the Reduction of Partial Standard Maps to General Plans of Buildings or the Cessation of Use ”(Jian Ji [2003] No. 89) Release railway lines and other professionals