论文部分内容阅读
随着美国对东海岸弗吉尼亚州穿越詹姆斯河口汉普顿公路的桥—隧道进行的分析和研究,美国国家公路和运输部正在审查新建伊丽莎白河沉管隧道的可能性,以期进一步缓和这一地区交通拥挤的状况。该项计划就是在已经建成的1280米长的伊丽莎白河沉管隧道旁边,再建一条沉管法
As the United States conducts its analysis and research on the bridge-tunnel crossing the James Road Estuary on the east coast of Virginia, the National Highway and Transport Department is reviewing the possibility of a new Elizabeth River immersed tunnel with a view to further easing traffic in the area Crowded situation. The plan is to build a 1280-meter-long Elizabethan River immersed tunnel next to a sinking method