论文部分内容阅读
随着社会经济的发展,我国的交通事业也得以快速的发展,高墩大桥作为当前社会的一种跨度比较大的桥梁,在桥梁工程领域得到了广泛的应用,特别是在那些地形比较复杂、山区、水库等地区,高墩大跨连续结构站着大多数,但是,在高墩大跨连续刚构桥梁在施工的时候,由于容易受到多种不定因素的干扰,这就使得其结构的内力是不断的变化着的,因此,在施工的是,就需要进行一个有效的施工监督,从而以便能够更好的保证其能够符合设计的要求,本文主要是以汕湛高速公路横江水库特大桥为例来进行一系列的研究和探索。
With the development of society and economy, China’s transportation industry has also been able to develop rapidly. As a large-span bridge in the current society, Gaodun Bridge has been widely used in the field of bridge engineering. Especially in the complex terrain, Mountainous areas, reservoirs and other areas, the high-pier and long-span continuous structures are mostly standing. However, during the construction of the continuous rigid-framed bridges with high pier and long span, due to their susceptibility to interference from various uncertainties, the internal forces of the structure Is constantly changing, therefore, in the construction is, you need to carry out an effective construction supervision, so as to be able to better ensure that they can meet the design requirements, this paper is mainly based on the Shanyan Expressway Hengjiang Reservoir Bridge Examples to conduct a series of research and exploration.