论文部分内容阅读
本文扼要阐述了东方电机股份有限公司为二滩电站所进行的水轮机模型研究,介绍了 GE 加拿大公司为该电站所做的水轮机模型验收试验。
This article briefly describes the turbine model of Dongfang Electric Co., Ltd. for Ertan Hydropower Station, and introduces the acceptance test of turbine model made by GE Canada for this power station.