《第三届全国渗流力学学术讨论会》在我校召开

来源 :南昌水专学报 | 被引量 : 0次 | 上传用户:lazysands
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
“第三届全国渗流力学学术讨论会”及“第二届水利水电工程渗流学术讨论会”第二次筹备会于1986年3月31日至4月9在我校召开。与会代表有10个单位的21位同志,其中教授、付教授、高级工程师共5人,工程师、讲师13人。本次会议研究了9月份在湖南大庸市召开渗流学术会议的具体问题,以及对学术讨论会收到的论文进行评审,本次会议实收论文101篇,论文涉及的范围比较广泛,包括岩土渗流基本 The Third Preparatory Meeting for the Third National Symposium on Seepage Mechanics and the Second Symposium on Seepage Flows for Hydraulic and Hydropower Engineering were held in our school from March 31 to April 9, Representatives of the 10 units of 21 comrades, including professors, professors, professors, a total of five senior engineers, engineers, lecturers 13 people. This meeting studied the specific problems of the academic meeting on percolation held in Dayong, Hunan Province in September and reviewed the dissertations received at the symposium. The conference has 101 papers in practice, covering a wide range of topics including rock Soil seepage basic
其他文献
英文中的“face”被译成中文时既有“脸”又有“面”的含义,而在汉语中很难界定两者之间的界限。本文将试着从两大方面:译成“脸”和译成“面”来探讨两者的区别,并在两种情
汉语水平考试(HSK)三级中写作部分虽然只有10题,考试时间仅有15分钟,但总成绩却有100分,占总分数的三分之一,有题量小、分数重、难度高的特点,特别是书写第一部分的完成句子
一、前言, 浅濑石川坝是正在岩木川水系浅濑石川上施工的直线重力式混凝土坝,高91米、坝顶长320米、坝体积约为70万立米;水库面积2.2平方公里、总库容5310万立米.该坝具有防
在经济发展步入转变方式、教育发展步入提高质量、职教发展步入体系构建的新阶段,教育部等三部委2010年共同启动了中等职业教育改革发展示范学校建设项目,从“十二·五”开局
这部影片的最初版本叫《铁娘子和她的照相馆》,那是还在读大三的塔玛尔初识照相馆主人米里亚姆时拍摄的20分钟的短片。其后,随着塔玛尔与米里亚姆关系的日益亲厚,这个让无数
今年4月,内蒙古首部民族音乐剧《阿拉善传奇》在北京保利剧院成功上演,并到天津、上海等十大城市巡演,取得良好反响。这部音乐剧不仅让全国观众耳目一新,而且对阿拉善这片传
美国俄勒冈州的盖尔维勒坝位于南乌姆普夸河的支流考克里克河上,库容为5,200万m~3,工程任务是灌溉、供水和防洪,并装2台1,800kW的小机组发电。该工程坝高49m,原考虑采用土坝
使用传统的混凝土坝施工方法,要想在一个半月之内建成一座高51米的坝几乎是不可能的.然而,采用70年代后期兴起的碾压混凝土筑坝(R C C)新技术,1985年在美国,一座高51米,坝顶
AIM:To construct the recombinant pEgr-P16 plasmid forthe investigation of its expression properties in esophagealsquamous cell carcinoma induced by ionizing ir
在如今的大多数汉语方言中,来母字读边音[l],但在部分方言中,来母三四等字被读为塞音[d]、[d]、[t]或[t](本文用不带方括号的d统称这类塞音)。从方言分布范围来看,这类音