介绍了某 6层砖混结构房屋顶升纠偏的整个过程及其中的一些关键技术 ,包括可拆卸式托换体系的托换方法、顶升系统的布置、顶升监测与控制。工程所取得的成果和经验可供其它顶升纠偏工程参考。
The whole process and some key technologies of the roofing correction of a 6-story masonry-concrete building are introduced, including the underpinning method of removable underpinning system, the layout of jacking system, the monitoring and control of jacking. The results and experience gained by the project can be used as reference for other projects to rectify and rectify.