(一)前言1958年6月间,包鋼水源工地提出了供給長期预报的这項要求,但是提的还不够明确,因此在制作预报前,特地到現場作了二次訪問,經介紹发現工程的安排,主要是根据了昭君坟1954~1957年的水位流量过程綫的变化情况而确定的。原計划认为:該地区年最大流量多发生在七月,过了八月以后就不会有大水了,因此把主要工程放在9月份里,安全施工水位估計为1008.5公尺。因为沒有考虑更多的資料,这个安排和計划显然很不合理。根据包头站23年資料統計,年最大流量发生在九月份的計有9次,发生在八月份
(I) Preface In June 1958, Baotou Steel Water Supply Plant proposed this requirement for long-term forecasting, but it was not clear enough. Therefore, before making the forecast, it made a special visit to the site and after the introduction of the report The arrangement of the project is mainly based on the changes of the water level flow process line of the Zhaojun grave from 1954 to 1957. The original plan was that the largest annual flow in the region occurred in July and there will be no flood after August. Therefore, major projects will be put into operation in September and the estimated safe water level will be 1008.5 meters. Because no more information has been considered, this arrangement and plan apparently are not reasonable. According to the 23-year statistics of Baotou Station, the annual maximum flow rate occurred in September was 9 times, which occurred in August