论文部分内容阅读
提出了自熵权、最大可能性的概念及其表达式;将矿井开采系统看成一个随机模糊的动态发展过程,提出多阶段、多目标、多层次随机模糊熵权的新方法,以工作面接续为例解决矿井生产计划的编制问题。
Proposed the concept and expression of the maximum possibility of self-entropy, and considered the mining system as a process of random fuzzy dynamic development. A new method of multi-stage, multi-objective and multi-level random fuzzy entropy is proposed. Continued as an example to solve the preparation of mine production planning issues.