论文部分内容阅读
岩土工程勘察体制自从20世纪80年代开始实施以来,主要是针对地面以下的岩土体等进行施工之前的岩体活动的施工控制。本文根据岩体勘察的技术分析以及岩体勘察的分类进行了详细的阐述,并根据勘察工程施工过程中的问题进行了研究,提出了相应的对策。
Since its implementation in the 1980s, the geotechnical engineering survey system has mainly focused on the construction control of the rock mass activities before the construction of the rock and soil below the ground. This article elaborates on the technical analysis of rock exploration and the classification of rock exploration. It also studies the problems in the construction process of the survey and proposes corresponding countermeasures.