红水河恶滩至石龙三江口航道整治工程是西南水运出海通道中线起步工程(广西段)的下段。其建设规模:航道按Ⅴ级航道通航250吨船舶的标准进行整治,通航保证率为90%,重现期2年,并进行助导航设施配置。本工程整治里程175公里,滩险36个。工程于2000年12月22日正式开工,施工合同期为25个月。 工程自开工建设以来,进展顺利,工程质量、投资、进度和安全等控制良好。今年元月29日至2月5日,由工程监理部主持,质量
Red River Ertan to Shilong Sanjiang Estuary waterway regulation project is the southwest waterway to sea channel start of the project (Guangxi section) of the lower section. Its construction scale: The waterway will be rehabilitated according to the standard of Class-V navigation channel of 250 tons of ships. The guarantee rate of navigation is 90% and the recurrence period is 2 years, and the allocation of navigation facilities will be assisted. The project remediation mileage of 175 km, Beach insurance 36. The project was officially started on December 22, 2000 with a construction contract period of 25 months. Since the start of construction, the project has progressed smoothly with good control of project quality, investment, progress and safety. January 29 this year to February 5, chaired by the Department of Engineering Supervision, quality