今年的整险工作,我们继续采取改草埽为石坝的方针。在整险效率与质量上都有显著的提高。砌石方面的最高效率每工已达七.九立公方,超过计划效率的七倍。平均效率如梁山段在第三期提高列四.八二立公方,鄄城段五.四立公方。扣石方面的最高效率为九.一平公方,平均效率为五平公方左右,而且一般的作到了不塞不垫,头缝严,坐缝稳,里石随沿石,层层跟淤胎的要求。关于收分的掌握百分之九十以上合乎标准,这样
For this year’s entire insurance work, we will continue to adopt the principle of changing grass to dam. In the entire insurance efficiency and quality have significantly improved. The maximum efficiency in masonry work has reached seven.9 cubic meters per worker, more than seven times the planned efficiency. The average efficiency, such as Liangshan section in the third period to improve the column IV. 82 Er Gong Fang, Juan Cheng Section V. Si Li Gong Fang. Kneading the highest efficiency of nine. A flat square, the average efficiency of about five square, and generally do not plug the pad, the first suture tight, sit tight, stone along the stone, layers of silt Request. Ninety percent or more of the mastery of the receipt is up to standard