土建施工与设备安装进行交叉作业能缩短建设工期 ,尽早形成生产能力 ,降低总造价。所以说 ,交叉作业是个好办法 ,应该加以采用推广。交叉作业施工是贯穿于施工过程的一项综合性工作 ,在作业过程中应抓住以下环节 :一、土建、安装综合性施工企业承担工程建设 ,在施工组织设计编
Civil construction and equipment installation cross-operation can shorten the construction period, as soon as possible to form the production capacity and reduce the total cost. So, cross-homework is a good idea and should be promoted. Cross-job construction is a comprehensive work that runs through the construction process. The following links should be grasped during the operation: I. Civil construction and installation The comprehensive construction enterprises undertake the construction of the project,