在毛主席革命路线指引下,在批修整风运动的推动下,我国电力工业正在迅速发展,我国自行设计、制造的5万瓩、12.5万瓩、20万瓩的中间再热机组已陆续投入运行,30万瓩机组正在安装,更大的机组亦在设计中。而中间再热机组启动旁路系统的设计和运行也就成为发展大容量、高参数火电机组中的一项重要课题。鉴于我国目前还没有充分积累有关的设计和运行经验。因此,在请示一机部电工局、
Under the guidance of Chairman Mao’s revolutionary line and with the approval of the rectification campaign, the power industry in our country is developing rapidly. China’s self-designed and manufactured intermediate reheat units of 50,000 瓩, 125,000 瓩 and 200,000 已 have been put into operation one after another 300,000 units are being installed and larger units are also being designed. However, the design and operation of the bypass system to start the reheat unit has also become an important issue in the development of large-capacity, high-parameter thermal power units. In view of our country has not yet fully accumulated relevant design and operation experience. Therefore, please refer to a Department of Electrical Bureau,