论文部分内容阅读
处于施工阶段的地下变电站主体结构的力学分析是工程界所关心的问题。本文推演了有关计算公式,求得了问题的解析解。这对于地下连续墙施工法和逆作施工法在工程建设中的应用具有一定的参考价值。
The mechanical analysis of the main structure of the underground substation in the construction stage is a concern of the engineering community. This article deduces the relevant formulas and solves the analytic solution of the problem. This has certain reference value for the application of the diaphragm wall construction method and the reverse construction method in engineering construction.